Bonnet Creek Resort Parking Structure

Orlando, Florida

Capacity:1,357 stalls, 5 elevated levels
Location:Orlando, Florida
Owner:KUD International
Status:Completion Date: 2009

By adding FINFROCK to the design-build team in the early planning stages of this project the developer was assured the most cost efficient garage for the resort. FINFROCK provided complete design-build services to the developer in addition to working with the program architect for the two major hotels.

FINFROCK suggested site plan changes that provided a different footprint than originally designed for the garage. Changes to the footprint allowed for a garage with more cost advantageous geometry which saved the owner over $2,000,000. The resulting garage surpassed expectations in its functional efficiency and ability to compliment the appearance of both hotels.


Next Project

Previous Project

Return to Parking

Save money, reduce risk and develop complete buildings faster with the FINFROCK process.