Nemours Children’s Hospital Parking Garage

Orlando, Florida

The Nemours Children’s Hospital parking garage was unique in that we wanted it to blend with the architecture of our new campus and provide safe, convenient parking for the families visiting the hospital. Our Design Team led multiple meetings with FINFROCK’s designers who responded to every challenge. During each phase of the project, the communication between Skanska, FINFROCK, the Design Team, and Nemours has been seamless.

Mike Cluff, AIA
Nemours Staff Architect

Capacity:Capacity: 896 stalls, 4 elevated levels
Location:Orlando, Florida
Owner:Nemours Children’s Hospital
Status:Completion Date: 2012

After winning the contract for the new Nemours Children’s Hospital, the contractor approached FINFROCK to assume responsibility for the design and construction of the 896-stall, four elevated level parking garage portion of the project at Lake Nona’s Medical City. FINFROCK served as architect of record, structural engineer, design-build contractor, and parking consultant.

As the design-builder for the 313,125 square-foot garage, FINFROCK worked with the hospital’s architect and construction manager to design the garage to compliment the 620,000 square-foot hospital. FINFROCK provided the most cost efficient design for the site footprint and constructed the project within Nemours budget. Precast concrete for the project was provided by FINFROCK and included pigmented concrete clad exterior structural panels that matched the adjacent architectural precast for the hospital.


Next Project

Previous Project

Return to Parking

Save money, reduce risk and develop complete buildings faster with the FINFROCK process.