Port Canaveral Cruise Terminal 8 Parking Garage

Port Canaveral, Florida

Capacity:991-stall, 5 elevated levels
Location:Port Canaveral, Florida
Owner:Canaveral Port Authority
Status:Completion Date: 2009

Completion of this project without disruption to the operations of the Port was paramount. As part of the design-build team, FINFROCK provided consultation services, as well as manufacturing and erection services.

FINFROCK worked a discontinuous work-week schedule to avoid any disruption to the Port’s spikes in cruise terminal traffic. FINFROCK served as structural engineer and precast concrete manufacturer and erector for Port Canaveral.


Next Project

Previous Project

Return to Parking

Save money, reduce risk and develop complete buildings faster with the FINFROCK process.