Solutions


Trade Six Pieces Of Information For A Guaranteed Lump Sum Price – Volume 13, Number 2

Posted: Fri, April 26, 2013
Stop using industry averages when budgeting structured parking and get a guaranteed lump sum price instead.


Download Journal (1 MB PDF)

OWNER BENEFITS OF A VERTICALLY INTEGRATED DESIGN-BUILD FIRM - Volume 13, Number 1

Posted: Thu, March 28, 2013
Keeping a significantly increased project scope on schedule.


Download Journal (1 MB PDF)

HOW CAN YOU QUICKLY ACHIEVE SUCCESS? - Volume 12, Number 4

Posted: Mon, October 29, 2012
Discover the building types that are a perfect fit for FINFROCK’s new DualDeck™ Building System.


Download Journal (757 KB PDF)

GAME CHANGING INVENTIONS AND INNOVATIONS - Volume 12, Number 3

Posted: Mon, August 27, 2012
Innovations and inventions from FINFROCK and other industries are improving productivity and decreasing cost. See how our latest invention, the DualDeck™ Structural System can deliver benefits to you.


Download Journal (630 KB PDF)

YOU CAN PAY ME NOW - OR PAY ME LATER – Volume 12, Number 2

Posted: Tue, May 08, 2012
Parking Garage Maintenance - You need to know the facts.


Download Journal (1 MB PDF)

FAILURE TO COMMUNICATE – Volume 12, Number 1

Posted: Tue, March 20, 2012
The missing link that threatens your bottom line and project viability. See four ways owners benefit when information flows both up and down the communication chain of service providers.


Download Journal (3 MB PDF)

How do you exploit tight sites in the best locations? - Volume 11, Number 4

Posted: Fri, November 11, 2011
See how a 42,000 square foot beach front retail and parking facility was constructed on less than one acre with limited interruption to the existing business.


Download Journal (5 MB PDF)

The economic concerns of your parking project - Volume 11, Number 3

Posted: Sat, September 03, 2011
Learn how Finfrock can guarantee the price of your next design-build parking garage.


Download Journal (1 MB PDF)


Page 3 of 4 pages  < 1 2 3 4 > 

Save money, reduce risk and develop complete buildings faster with the FINFROCK process.