Solutions


How do you exploit tight sites in the best locations? - Volume 11, Number 4

Posted: Fri, November 11, 2011
See how a 42,000 square foot beach front retail and parking facility was constructed on less than one acre with limited interruption to the existing business.


Download Journal (5 MB PDF)

The economic concerns of your parking project - Volume 11, Number 3

Posted: Sat, September 03, 2011
Learn how Finfrock can guarantee the price of your next design-build parking garage.


Download Journal (1 MB PDF)

Reducing your risk by choosing the project procurement method – Volume 11, Number 2

Posted: Wed, May 11, 2011
Learn the many benefits of Design-Build project procurement.


Download Journal (564 KB PDF)

The difference between low cost, best price and greatest value - Volume 11, Number 1

Posted: Thu, January 20, 2011
Learn how Finfrock provides not only the best price and the lowest cost but the Greatest Value on Design-Build projects.


Download Journal (6 MB PDF)

Applying architectural finishes to structural concrete products - Volume 10, Number 4

Posted: Tue, November 23, 2010
Learn how architectural finishes are being incorporated into structural precast concrete panels to give you high quality aesthetics for a fraction of the cost.


Download Journal (400 KB PDF)

The economics of geometry and cost in structured parking – Volume 10, Number 3

Posted: Wed, September 15, 2010
Learn how the basics of geometry can increase parking efficiency and reduce construction costs


Download Journal (483 KB PDF)

Benefits of a precast/prestressed structural system – Volume 10, Number 2

Posted: Tue, August 03, 2010
Learn how to tap into the benefits of a precast/prestressed manufactured structure.


Download Journal (1 MB PDF)

Analysis between Precast/prestressed concrete and cast in place (CIP) concrete – Volume 10, Number 1

Posted: Sat, May 15, 2010
Discover why precast/prestressed concrete offers dramatically greater benefits and superior construction over cast-in-place concrete.


Download Journal (534 KB PDF)


Page 4 of 5 pages ‹ First  < 2 3 4 5 > 

Save money, reduce risk and develop complete buildings faster with the FINFROCK process.