Jefferson at Young Circle

Hollywood, Florida

The use of precast components in this parking garage reduced the overall construction schedule and minimized disruption to the public.

Capacity

645 stalls, 5 elevated levels

Owner

The City of Hollywood

Status

Completed 2002

When JPI was selected by the City of Hollywood to develop this residential project they entered into a design-build agreement with FINFROCK.

 

FINFROCK served as architect of record, structural engineer, design-build contractor, and parking consultant. The project was delivered on time and without change orders.

SHARE

"FINFROCK did an excellent job in facilitating the design and fast-tracking of permits. They met their schedule and together, both JPI and The City of Hollywood are very pleased with the result. Best of all, FINFROCK did an extraordinary job during the erection process. The downtown site is a postage stamp, which required careful attention to detail in the planning, delivery and erection of the precast materials to avoid conflicts with the general public."

 

Curtis Bentley
JPI