Keller Center Parking Garage

Maitland, Florida

FINFROCK served as the design-build general contractor for this 419 stall, 3 elevated level garage.

Capacity

419 stalls, 3 elevated levels

Owner

TerraCap Management Corporation

Status

Completed 2016

FINFROCK’s Design-Build saves time and money.

 

When the use of their nearly 30-year-old office building changed and the existing surface parking was no longer adequate, this owner sought out FINFROCK for parking expertise and the single source of responsibility supplied. After checking local prices for free standing garage construction, the owner was confident that FINFROCK would deliver at a cost below market averages.  In-house architects designed a garage, matching the exposed aggregate finish on the new structural elements of the garage to the architectural concrete on the existing office.

 

FINFROCK acted as architect, structural engineer, precast/prestressed concrete manufacturer, general contractor and parking consultant on the 419 stall, three elevated level garage.

 

FINFROCK’s in-house services included; parking consulting, architect of record, engineer of record, precast/prestressed concrete manufacturing and general contracting.

SHARE

"FINFROCK’s unique design-build model delivered our project on time and on budget; it couldn't have gone any smoother."

 

Albert S. Livingston
Director of Asset Management
TerraCap Management Corp

Experience the benefits of the FINFROCK process on your next building.




Loading