Moffitt McKinley Garage

Tampa, Florida

The challenge presented to respondents of the RFP for this project was to cost-effectively park the maximum number of cars in the space allotted.

Capacity

1,226 Stalls, 6 elevated levels

Owner

H Lee Moffitt Cancer Center & Research Institute, Inc

Status

Completed 2014

FINFROCK responded with the best design, lowest cost and most functional garage-coming in $1 million dollars lower than the competition.

 

FINFROCK served as the architect and engineer of record, design-build contractor and precast concrete manufacturer for the 1,226 stall, 6 elevated level garage.