Port Canaveral CT-6 Garage

Cape Canaveral, Florida

The team provided the only proposal with a path to meet the owner’s budget while still maintaining the required amenities package

Capacity

785 stalls, 2 elevated levels

Owner

Port Canaveral Authority

Status

Completed 2012

FINFROCK provided the parking consulting, design and precast concrete manufacturing input for the team selected to build a parking garage for a new cruise ship terminal at Port Canaveral Florida. With severe budget constraints on the project, FINFROCK recommended reconfiguring the footprint suggested in the criteria documents distributed to all respondents.

 

The team provided the only proposal with a path to meet the owner’s budget while still maintaining the required amenities package which included a drop-off area, employee lounge and retail shops for employees and cruise patrons. Additionally FINFROCK designed the garage so that it can be expanded on one side.

 

FINFROCK served as architect of record, structural engineer of record, design-build contractor and parking consultant for Ivey’s Construction, Inc.