FInish Date
No. Stalls
No. Levels
aurora
Parking Garage
FInish Date
No. Stalls
No. Levels
Complete design-manufacture-construct
FINFROCK worked onsite with the general contractor, delivering the parking structure for the apartments which are attached to the parking on two sides. The project was designed such that the floor level from the garage into the apartments was at the same elevation. Additionally, the building needed to be designed to support the code required public art to the façade. The parking structure design includes trash chutes, trash compactor, maintenance rooms, storm vault and dog wash station.
FINFROCK served as architect, structural engineer, precast/prestressed concrete manufacturer, general contractor and parking consultant on the 546 stall, six elevated level design-build parking structure.