Significant cost reductions and improved traffic flow
FINFROCK optimized the design criteria to better fit the difficult site and improve the structure’s efficiency while still honoring the modularity of the precast concrete components. This resulted in significant cost reductions and improved traffic flow. FINFROCK served as the design-build general contractor for this 495 stall, one elevated level garage which include valet office and storage facilities. FINFROCK’s in-house services included; parking consulting, architect of record, engineer of record, precast/prestressed concrete manufacturing and general contracting.