Harborside Inn & Marina
PARKING GARAGE
FINFROCK served as the design-build general contractor, parking consultant, and precast concrete manufacturer
FINFROCK takes responsibility and lowers risk
FInish Date
No. Stalls
No. Levels
Working with the owner and the contractor of the residential units, FINFROCK was able to value engineer significant savings from the original design and budget while maintaining the already approved architectural concept. The total construction time for the 4-elevated-level, 525-space parking structure was 4½ months.