FINFROCK takes responsibility and lowers risk
Working with the owner and the contractor of the residential units, FINFROCK was able to value engineer significant savings from the original design and budget while maintaining the already approved architectural concept. The total construction time for the 4 elevated level, 525 space parking structure was 4½ months.
FINFROCK served as architect of record, structural engineer, designbuild contractor, and parking consultant. The project was delivered on time and without change orders