Post Parkside
Post Parkside

MAA parkside

PARKING GARAGE

FINFROCK served as the design-build general contractor, parking consultant, and precast concrete manufacturer

Private resident access

FInish Date

No. Stalls

No. Levels

MAA Properties selected FINFROCK to design, manufacture, and construct this 480-stall parking structure in Downtown Orlando’s historical district. In addition to parking, the mixed-use facility accommodates retail and residential. FINFROCK designed the 150,890 square-foot garage so that the public has entrance to only the ground level with residents having the right of entry to the elevated parking levels, which includes direct access to apartments.